概述:很多人對(duì)自動(dòng)攪拌車(chē)的組成還有很多疑問(wèn),但正如你所知,自動(dòng)攪拌車(chē)是我們生活中非常重要的設(shè)備,讓我們一起來(lái)了解一下
很多人對(duì)自動(dòng)攪拌車(chē)的組成還有很多疑問(wèn),但正如你所知,自動(dòng)攪拌車(chē)是我們生活中非常重要的設(shè)備,讓我們一起來(lái)了解一下。
Many people still have many questions about the composition of the automatic mixer, but as you know, the automatic mixer is a very important equipment in our life. Let's learn about it.
軸端泄漏引起的軸承磨損和與混合軸的摩擦導(dǎo)致軸端高溫。主軸端是集中的部分。在高強(qiáng)度應(yīng)力作用下,零件的使用壽命將大大縮短。因此,需要及時(shí)更換軸封裝置中的密封圈、油封、滑動(dòng)輪和旋轉(zhuǎn)輪;并將主軸的末端泄漏端側(cè)的軸承建議為原密封附件,避免尺寸的差異和磨損,可迅速損壞主軸。及時(shí)檢查潤(rùn)滑系統(tǒng):
Bearing wear caused by shaft end leakage and friction with mixed shaft result in high temperature of shaft end. The spindle end is the concentrated part. Under the action of high strength stress, the service life of parts will be greatly shortened. Therefore, it is necessary to replace the seal ring, oil seal, sliding wheel and rotating wheel in the shaft seal device in time, and recommend the bearing at the leakage end of the spindle as the original sealing accessory, so as to avoid the size difference and wear, and quickly damage the spindle. Check the lubrication system in time
一、潤(rùn)滑系統(tǒng)中主油泵旋轉(zhuǎn)軸的磨損現(xiàn)象
1、 Wear phenomenon of rotating shaft of main oil pump in lubrication system
二.潤(rùn)滑系統(tǒng)中的主油泵壓力表的接口柱塞不能正常工作。
2、 The interface plunger of the main oil pump pressure gauge in the lubrication system can not work normally.
三、漸進(jìn)式分油器閥閥芯在潤(rùn)滑系統(tǒng)中堵塞,不能分油。
3、 The safety valve core of progressive oil separator is blocked in the lubrication system and cannot separate oil.
由于上述原因,軸潤(rùn)滑系統(tǒng)故障,需要更換主油泵潤(rùn)滑系統(tǒng)。
Due to the above reasons, the shaft lubrication system is in trouble, and the main oil pump lubrication system needs to be replaced.
如果你想使自動(dòng)攪拌車(chē)的風(fēng)險(xiǎn)控制,應(yīng)該從以下幾個(gè)方面入手:
If you want to control the risk of automatic mixer, you should start from the following aspects:
1)自動(dòng)攪拌車(chē)的成本控制。這主要是指混凝土攪拌機(jī),因?yàn)榛炷翑嚢铏C(jī)的投入和生產(chǎn)成本相對(duì)較低,易于管理。
1) Cost control of automatic mixer. This mainly refers to the concrete mixer, because the concrete mixer input and production costs are relatively low, easy to manage.
2)對(duì)整個(gè)混凝土攪拌機(jī)的生產(chǎn)過(guò)程進(jìn)行細(xì)分,掌握各環(huán)節(jié)生產(chǎn)過(guò)程的成本。
2) Subdivide the production process of the whole concrete mixer, and master the cost of each link of the production process.
3)做整個(gè)混凝土攪拌機(jī)銷(xiāo)售計(jì)劃,制定相應(yīng)的生產(chǎn)和銷(xiāo)售計(jì)劃。
3) Make the whole concrete mixer sales plan, formulate the corresponding production and sales plan.
4)做好全站財(cái)務(wù)審計(jì)制度,確保全資金鏈有序發(fā)展。建議是減少銷(xiāo)售,而不是缺乏資金鏈。
4) Do a good job in the financial audit system of the whole station to ensure the orderly development of the wholly-owned gold chain. The suggestion is to reduce sales, not lack of capital chain.