RM新时代入口

歡迎來到中科聚峰機(jī)械有限公司!

24小時(shí)服務(wù)熱線:

400-879-1999

點(diǎn)擊撥打服務(wù)熱線:400-879-1999
當(dāng)前位置:首頁>新聞中心>行業(yè)新聞自動(dòng)攪拌車15條操作規(guī)程

自動(dòng)攪拌車15條操作規(guī)程

來源:http://kitchinit.com/ 日期:2022-09-28 發(fā)布人:admin
概述:操作是自動(dòng)攪拌車完成其工作任務(wù)的基本保證,也是自動(dòng)攪拌車操作、維修和周圍施工人員人身的可靠保證。下面小編為您講講自動(dòng)攪拌車
操作是自動(dòng)攪拌車完成其工作任務(wù)的基本保證,也是自動(dòng)攪拌車操作、維修和周圍施工人員人身的可靠保證。下面小編為您講講自動(dòng)攪拌車15條操作規(guī)程。
Safe operation is the basic guarantee for the automatic mixer to complete its work tasks, and is also a reliable guarantee for the operation and maintenance of the automatic mixer and the personal safety of surrounding construction personnel. Here are 15 safety operation rules for automatic mixer truck.
一、自動(dòng)攪拌車的汽車部分應(yīng)執(zhí)行汽車一般技術(shù)要求的規(guī)定。
1、 The vehicle part of the automatic mixer shall comply with the general safety technical requirements for vehicles.
二、自動(dòng)攪拌車的燃油、液壓油、潤滑油、制動(dòng)液、冷卻水等應(yīng)添加充足,質(zhì)量應(yīng)符合要求。
2、 The fuel, hydraulic oil, lubricating oil, brake fluid, cooling water, etc. of the automatic mixer shall be added sufficiently, and the quality shall meet the requirements.
三、攪拌筒和滑槽的外觀應(yīng)無裂痕或損傷;滑槽止動(dòng)器應(yīng)無松馳和損壞;攪拌筒機(jī)架緩沖件應(yīng)無裂痕或損傷;攪拌葉片磨損應(yīng)正常。
3、 The appearance of mixing drum and chute shall be free of cracks or damage; The chute stopper shall be free from looseness and damage; The buffer parts of the mixing drum frame shall be free of cracks or damage; The mixing blade shall be worn normally.
四、應(yīng)檢查動(dòng)力輸出裝置并確認(rèn)無螺栓松動(dòng)及軸承漏油等現(xiàn)象。
4、 Check the power take-off device and make sure there is no loose bolt, bearing oil leakage, etc.
五、啟動(dòng)內(nèi)燃機(jī)應(yīng)進(jìn)行預(yù)熱運(yùn)轉(zhuǎn),各儀表指示值正常,制定氣壓達(dá)到規(guī)定值,并應(yīng)低速旋轉(zhuǎn)攪拌筒3~5min,確認(rèn)一切正常后,方可裝料。
5、 When starting the internal combustion engine, the engine shall be preheated. The indicated value of each instrument shall be normal. The specified air pressure shall reach the specified value. The mixing drum shall be rotated at a low speed for 3~5min. After confirming that everything is normal, the material can be loaded.
六、攪拌運(yùn)輸時(shí),混凝土的裝載量不得超過額定容量。
6、 During mixing and transportation, the loading capacity of concrete shall not exceed the rated capacity.
七、自動(dòng)攪拌車裝料前,應(yīng)先將攪拌筒反轉(zhuǎn),使筒內(nèi)的積水和雜物排盡。
7、 Before the automatic mixer truck is loaded, the mixing drum shall be reversed to drain the accumulated water and sundries in the drum.
八、裝料時(shí),應(yīng)將操縱桿放在“裝料”位置,并調(diào)節(jié)攪拌筒轉(zhuǎn)速,使進(jìn)料順利。
8、 When loading, place the control lever at the "Loading" position and adjust the rotation speed of the mixing drum to ensure smooth feeding.
自動(dòng)攪拌車
九、運(yùn)輸前,排料槽應(yīng)鎖止在“行駛”位置,不得自由擺動(dòng)。
9、 Before transportation, the discharge chute shall be locked in the "driving" position and shall not swing freely.
十、運(yùn)輸中,攪拌筒應(yīng)低速旋轉(zhuǎn),但不得停轉(zhuǎn)。運(yùn)送混凝土的時(shí)間不得超過規(guī)定的時(shí)間。
10、 During transportation, the mixing drum shall rotate at a low speed, but shall not stop. The time for transporting concrete shall not exceed the specified time.
十一、攪拌筒由正轉(zhuǎn)變?yōu)榉崔D(zhuǎn)時(shí),應(yīng)先將操縱手柄放在中間位置,待攪拌筒停轉(zhuǎn)后,再將操縱桿手柄放反轉(zhuǎn)位置。
11、 When the mixing drum changes from positive to reverse, the operating handle shall be placed in the middle position first, and then the operating lever handle shall be placed in the reverse position after the mixing drum stops rotating.
十二、行駛在不平路面或轉(zhuǎn)彎處應(yīng)降低車速15km/h及以下,并暫停攪拌旋轉(zhuǎn)。通過門橋、洞等設(shè)施時(shí),不得超過其限制高度及寬度。
12、 The speed shall be reduced to 15km/h or less when driving on uneven roads or at corners, and the mixing rotation shall be suspended. When passing through the gate bridge, hole and other facilities, the height and width shall not exceed the limit.
十三、攪拌裝置連續(xù)運(yùn)轉(zhuǎn)時(shí)間不宜超過8h。
13、 The continuous operation time of the mixing device should not exceed 8h.
十四、水箱的水位應(yīng)保持正常。冬季停車時(shí),應(yīng)將水箱和供水系統(tǒng)的積水放凈。
14、 The water level of the water tank shall be kept normal. When parking in winter, the accumulated water in the water tank and water supply system shall be drained.
十五、用于攪拌混凝土?xí)r,應(yīng)在攪拌筒內(nèi)先加入總需水量2/3的水,然后再加入骨料和水泥按出廠說明書規(guī)定的轉(zhuǎn)速和時(shí)間進(jìn)行攪拌。
15、 When mixing concrete, 2/3 of the total water demand shall be added into the mixing cylinder first, and then the aggregate and cement shall be added for mixing according to the speed and time specified in the factory instructions.
自動(dòng)攪拌車15條操作規(guī)程相關(guān)內(nèi)容已經(jīng)講解完畢了,更多的注意事項(xiàng)就來我們網(wǎng)站http://kitchinit.com咨詢吧!
The relevant contents of the 15 safety operating procedures for automatic mixer have been explained. More precautions can be found on our website http://kitchinit.com Consult!

截屏,微信識(shí)別二維碼

RM新时代入口