概述:攪拌一體車作為一種建設(shè)機械產(chǎn)品,對于提高施工效率,降低成本起著很大的作用,但是在施工過程中要注意正確操作,下面是攪拌一體車的操作流
攪拌一體車作為一種建設(shè)機械產(chǎn)品,對于提高施工效率,降低成本起著很大的作用,但是在施工過程中要注意正確操作,下面是攪拌一體車的操作流程:
As a construction mechanical product, the mixer truck plays a very important role in improving construction efficiency and reducing costs. However, attention should be paid to correct operation during construction. The following is the operation process of the mixer truck:
1、停車
1. Parking
將攪拌一體車行駛停放到工作區(qū),拉好手剎將檔位撥空擋熄火,注意要將泵車停在泵送臂架工作范圍內(nèi)。
Drive the mixer truck and park it in the working area. Pull the hand brake and turn the gear to neutral to stop the engine. Pay attention to parking the pump truck within the working range of the pumping arm.
2、轉(zhuǎn)換發(fā)動機工作狀態(tài)
2. Switch the engine working state
將電控箱操作面板上的行車開關(guān)轉(zhuǎn)換泵送位置,啟動底盤發(fā)動機,將底盤檔位掛到6檔,同時檢查攪拌機電箱、支腿與臂架轉(zhuǎn)換位置、主電控箱、泵車無線遙控器和攪拌機有線遙控的急停開關(guān)是否有打開。
Switch the traveling switch on the operation panel of the electric control box to the pumping position, start the chassis engine, shift the chassis gear to gear 6, and check whether the emergency stop switches of the agitator box, outrigger and boom switch positions, the main electric control box, the wireless remote control of the pump truck and the wired remote control of the mixer are turned on.
3、伸展支腿
3. Stretch outriggers
將臂架支腿轉(zhuǎn)換開關(guān)切換到支腿位置,依次將六條泵機支腿展開。注意將支腿下方墊木方,這樣是用支承板或輔助方木來增大支承表面積,從而保持整車的平衡。
Switch the boom outrigger change-over switch to the outrigger position, and unfold the six pump outriggers in turn. Pay attention to cushion the wooden square under the outrigger. In this way, the bearing plate or auxiliary square timber is used to increase the bearing surface area, so as to maintain the balance of the whole vehicle.
4、伸展臂架
4. Extension boom
將臂架支腿轉(zhuǎn)換開關(guān)切換到臂架位置,將大臂伸開。
Switch the boom outrigger change-over switch to the boom position and extend the boom.
5、支撐攪拌機
5. Support mixer
拔出攪拌機定位銷,將攪拌機推動到工作位置,插好定位銷。放下上料斗上下滑道,連接好固定螺栓。
Pull out the positioning pin of the mixer, push the mixer to the working position, and insert the positioning pin. Lower the upper and lower slides of the upper hopper and connect the fixing bolts.
6、啟動發(fā)電機
6. Start generator
啟動時要注意看發(fā)電機組空氣開關(guān)是否處于斷開狀態(tài),不能帶負(fù)荷啟動,以免影響發(fā)電機消磁。
When starting, pay attention to whether the air switch of the generator set is in the off state, and do not start with load to avoid affecting the degaussing of the generator.
7、開始泵送
7. Start pumping
將混凝土原料放入泵車料斗,等待混凝土攪拌好后,將攪拌好的混凝土放入料斗連續(xù)泵送。
Put the concrete raw materials into the hopper of the pump truck, wait for the concrete to be mixed, and then put the mixed concrete into the hopper for continuous pumping.
8、清洗
8. Cleaning
泵送完畢后,要對攪拌一體車進行清洗,先清洗干凈料斗內(nèi)的混凝土,然后沖洗料斗。
After pumping, the mixer truck shall be cleaned. First, the concrete in the hopper shall be cleaned, and then the hopper shall be washed.
9、關(guān)閉發(fā)電機組
9. Shut down the generator set
斷開空氣開關(guān),將發(fā)電機組柴油機轉(zhuǎn)速降低速運轉(zhuǎn)30秒后關(guān)閉發(fā)電機組。
Disconnect the air switch, reduce the speed of the diesel engine of the generator set to low speed for 30 seconds, and then shut down the generator set.
10、收車
10. Collection
將攪拌一體車收到行車狀態(tài),插好定位銷,依次收好臂架和支腿,將底盤檔位撥空擋,將轉(zhuǎn)換開關(guān)切換行車狀態(tài)。
After receiving the driving status of the mixer truck, insert the positioning pin, put the boom and outrigger in order, shift the chassis gear to neutral, and switch the change-over switch to the driving status.
攪拌一體車屬于特種工程機械,作業(yè)前一定要經(jīng)過培訓(xùn)考核合格才能操作。畢竟為重,不能大意,您有什么問題就來我們網(wǎng)站
http://kitchinit.com咨詢吧!
The mixer truck belongs to special construction machinery, and must pass the training and examination before operation. After all, safety is the most important thing. Don't be careless. Come to our website if you have any problems http://kitchinit.com Consult!