概述:自動(dòng)攪拌車工作時(shí)間越長(zhǎng),就會(huì)遇到皮帶機(jī)跑偏,中間過(guò)渡料倉(cāng)不投料,骨料進(jìn)料門(mén)卡料,皮帶機(jī)雨天打滑,粉料進(jìn)料緩慢等問(wèn)題。遇到這樣的 問(wèn)
自動(dòng)攪拌車工作時(shí)間越長(zhǎng),就會(huì)遇到皮帶機(jī)跑偏,中間過(guò)渡料倉(cāng)不投料,骨料進(jìn)料門(mén)卡料,皮帶機(jī)雨天打滑,粉料進(jìn)料緩慢等問(wèn)題。遇到這樣的 問(wèn)題后,可能就要影響整條混凝土生產(chǎn)線的生產(chǎn)了,所以及時(shí)找到問(wèn)題所在并找到的辦法,可以增加產(chǎn)量,減少損失。本文自動(dòng)攪拌車廠家就給大家介紹一下怎么自動(dòng)攪拌車中間過(guò)渡倉(cāng)不投料的問(wèn)題。
The longer the working time of the automatic mixer is, the problems will be encountered, such as deviation of the belt conveyor, non feeding of the intermediate transition silo, jamming of the aggregate feeding door, slipping of the belt conveyor in rainy days, slow feeding of powder and so on. In case of such problems, the production of the whole concrete production line may be affected. Therefore, finding the problem in time and finding a solution can increase the output and reduce the loss. In this paper, the automatic mixer manufacturer will introduce to you how to solve the problem of no feeding in the intermediate transition bin of the automatic mixer.
1.在自動(dòng)攪拌車生產(chǎn)過(guò)程中如出現(xiàn)中間過(guò)度倉(cāng)不往攪拌機(jī)內(nèi)卸料,就應(yīng)該檢查粉灰秤、水泥秤、外加劑秤、水秤是否已經(jīng)稱量到位,中間過(guò)度倉(cāng)的限位開(kāi)關(guān)是否檢測(cè)到位,攪拌站攪拌主機(jī)卸料門(mén)是否關(guān)門(mén)到位。
1. In the production process of automatic mixer truck, if the intermediate transition bin does not unload into the mixer, check whether the powder ash scale, cement scale, admixture scale and water scale have been weighed in place, whether the limit switch of the intermediate transition bin is detected in place, and whether the unloading door of the mixing host of the mixing plant is closed in place.
2.檢查自動(dòng)攪拌車攪拌主機(jī)內(nèi)有沒(méi)有料,如果還沒(méi)卸料,攪拌時(shí)間到可以按下卸料門(mén)按鈕,行卸料。
2. Check whether there is material in the mixing host of the automatic mixer. If it has not been unloaded, press the unloading door button when the mixing time is up, and unload the material first.
3.混凝土攪拌站皮帶延時(shí)未到設(shè)定值亦不投料;料門(mén)被卡住打不開(kāi),開(kāi)門(mén)氣缸感應(yīng)器沒(méi)有檢測(cè)到位或失靈,氣缸串氣,密封件損壞,開(kāi)門(mén)機(jī)構(gòu)不夠靈活,氣壓不夠,氣缸失靈等原因也應(yīng)該還加以考慮。
3. The belt of the concrete mixing plant will not be fed until the time delay reaches the set value; The material door is stuck and can not be opened, the door opening cylinder sensor is not detected in place or fails, the cylinder is crosstalk, the seal is damaged, the door opening mechanism is not flexible enough, the air pressure is not enough, the cylinder fails and other reasons should also be considered.
4.攪拌站中間過(guò)度倉(cāng)打開(kāi)后再關(guān)上的時(shí)候無(wú)法檢測(cè)到關(guān)門(mén)信號(hào),應(yīng)該先用攪拌站手動(dòng)開(kāi)關(guān)門(mén)開(kāi)關(guān)試,如果還不行就應(yīng)該檢查限位開(kāi)關(guān)以及線路時(shí)好時(shí)壞、是否異味松脫、門(mén)板上是否有集料粘在上面,或開(kāi)門(mén)機(jī)構(gòu)的調(diào)節(jié)螺栓是否松動(dòng),沒(méi)有調(diào)節(jié)到位。
4. If the door closing signal cannot be detected when the intermediate transition bin of the mixing plant is opened and then closed, the manual door opening and closing switch of the mixing plant should be used first. If not, check the limit switch and whether the line is good or bad, whether the peculiar smell is loose, whether there is aggregate stuck on the door plate, or whether the adjusting bolt of the door opening mechanism is loose and not adjusted in place.
5.卸料門(mén)接近開(kāi)關(guān)沒(méi)有檢測(cè)到位或接近開(kāi)關(guān)損壞,重新調(diào)整位置或更換。
5. If the proximity switch of the discharge door is not detected in place or the proximity switch is damaged, readjust the position or replace it.