概述:自動上料攪拌車由于其高施工效率和快速方便的過渡模式而受到建筑行業(yè)的歡迎。梯式混凝土攪拌機運動方便,布料方便,效率高,性價比高,大大降低了人工成本。這是購買攪拌車的不錯選擇
自動上料攪拌車由于其高施工效率和快速方便的過渡模式而受到建筑行業(yè)的歡迎。梯式混凝土攪拌機運動方便,布料方便,效率高,性價比高,大大降低了人工成本。這是購買攪拌車的不錯選擇。根據(jù)正確的操作步驟,可以安 全,平穩(wěn)地進行混凝土施工,有用延長梯式自動上料攪拌車攪拌機的使用壽命,提高施工效率,創(chuàng)造使用價值。
Automatic feeding mixer is popular in the construction industry because of its high construction efficiency and fast and convenient transition mode. The ladder type concrete mixer has the advantages of convenient movement, convenient distribution, high efficiency and high cost performance, which greatly reduces the labor cost. This is a good choice to buy mixer. According to the correct operation steps, the concrete construction can be carried out safely and smoothly, the service life of the mixer of the ladder type automatic feeding mixer can be extended, the construction efficiency can be improved, and the use value can be created.
自動上料攪拌車應(yīng)停放在水平且堅固的地方,周圍沒有障礙物。安裝現(xiàn)場時,請考慮地面平整而堅固。不要將其安裝在有斜坡,凹坑或軟地質(zhì)的地方。在現(xiàn)場澆筑一個扁平的混凝土基礎(chǔ)。事實上,這些需要在自動上料攪拌車進入現(xiàn)場之前完成。將混凝土泵放在混凝土基礎(chǔ)或?qū)嵭牡匕迳?,用千斤頂調(diào)整高度,使行走輪離地,并用定位銷和腿的安 全銷將其鎖定。但是,須確保料斗門開關(guān)是自由且易于清潔的。
The automatic feeding mixer should be parked in a horizontal and solid place without obstacles. When installing on site, please consider that the ground is flat and firm. Do not install it in places with slopes, pits or soft geology. Place a flat concrete foundation on site. In fact, these need to be completed before the automatic feeding mixer enters the site. Place the concrete pump on the concrete foundation or solid floor, adjust the height with the jack to make the walking wheel off the ground, and lock it with the positioning pin and the safety pin of the leg. However, make sure that the hopper door switch is free and easy to clean.
首先,混合罐中沒有碎屑,料斗上的保護網(wǎng)格完好且緊密封閉;燃料,潤滑油,液壓油和水箱全部添加,輪胎壓力符合規(guī)定,照明和信號指示器齊全;輸送管牢固連接并密封。液壓系統(tǒng)正常工作,管道無泄漏;洗衣泵設(shè)備齊全;配電桿的延伸應(yīng)按工廠規(guī)定的順序進行,吊臂可從支架上抬起后擺動。請勿使用臂桿抬起或拖動物體。
First, there is no debris in the mixing tank, and the protective grid on the hopper is intact and tightly closed; The fuel, lubricating oil, hydraulic oil and water tank are all added, the tire pressure meets the requirements, and the lighting and signal indicators are complete; The conveying pipe is firmly connected and sealed. The hydraulic system works normally and the pipeline has no leakage; The washing pump is fully equipped; The extension of the distribution pole shall be carried out in the order specified by the factory, and the boom can be lifted from the support and swing. Do not use the boom to lift or drag objects.