RM新时代入口

歡迎來到中科聚峰機(jī)械有限公司!

24小時服務(wù)熱線:

400-879-1999

點(diǎn)擊撥打服務(wù)熱線:400-879-1999
當(dāng)前位置:首頁>新聞中心>公司動態(tài)攪拌車使用時間越久自身越重的原因

攪拌車使用時間越久自身越重的原因

來源:http://kitchinit.com/ 日期:2022-08-08 發(fā)布人:admin
概述:一直都有用戶在反映,新的自動攪拌車買回去用久了車變得越來越重了,問怎么解決,那么今天我們就來說說到底是什么原因造成攪拌車越來越重的
一直都有用戶在反映,新的自動攪拌車買回去用久了車變得越來越重了,問怎么解決,那么今天我們就來說說到底是什么原因造成攪拌車越來越重的呢?出現(xiàn)這種情況又該怎么解決了?
Users have been reflecting that the new automatic mixer truck has become heavier and heavier after being bought and used for a long time. How to solve this problem? Today, let's talk about what causes the mixer truck to become heavier and heavier? How to solve this situation?
一、防止沾罐 快裝快卸是關(guān)鍵
1、 Quick loading and unloading is the key to prevent the tank from getting stuck
隨車帶上減水劑
Bring water reducer with the vehicle
減水劑是一種在維持混凝土坍落度不變的條件下,能減少拌合用水量的混凝土外加劑,隨車攜帶,能對混凝土進(jìn)行很好的調(diào)節(jié)。不過在加入減水劑的時候,一定要記得有商砼站化驗室的人在場,否則混凝土質(zhì)量強(qiáng)度不夠,駕駛員要承擔(dān)后果。
Water reducer is a kind of concrete admixture that can reduce the amount of water used for mixing under the condition of maintaining the concrete slump unchanged. It can be carried with the vehicle and can adjust the concrete well. However, when adding water reducing agent, it must be remembered that there are people in the laboratory of commercial concrete station, otherwise the concrete quality and strength are not enough, and the driver shall bear the consequences.
回廠檢查罐內(nèi)水量
Return to the factory to check the water volume in the tank
每次出車任務(wù)完成回到站內(nèi)的時候,檢查儲水罐內(nèi)的水量,好讓水罐中的水隨時處于滿罐的狀態(tài),以備不時之需。
When returning to the station after each trip, check the water volume in the water storage tank, so that the water in the water tank can be full at any time, in case of emergency.
離廠前檢查混凝土質(zhì)量
Check the concrete quality before leaving the factory
可能會因為原料的不同,每一盤混凝土質(zhì)量都會有變化。在裝好混凝土離場時,一定要檢查罐內(nèi)混凝土的塌落度情況以及和易度,小心混凝土的提前凝結(jié)和混凝土分層沉淀。
The quality of each plate of concrete may vary due to different raw materials. When the concrete is loaded and leaving the site, it is necessary to check the slump and workability of the concrete in the tank, and be careful of the early setting of the concrete and the layered precipitation of the concrete.
減少車輛行駛時間
Reduce vehicle travel time
混凝土運(yùn)距一般在直徑30公里范圍以內(nèi),出車之前規(guī)劃好路線以及車輛通行情況,盡量減少車輛在路上的時間。
The concrete transportation distance is generally within the range of 30km in diameter. The route and the traffic conditions of vehicles shall be planned before departure to minimize the time of vehicles on the road.
減少損失先卸料
Reduce losses and unload first
如果遇到人為因素或者不可抗因素,導(dǎo)致長時間無法卸料的情況,應(yīng)隨時查看罐內(nèi)混凝土情況,一旦發(fā)現(xiàn)混凝土開始凝結(jié)。在報備負(fù)責(zé)人之后立刻進(jìn)行卸料,以防整個罐體報廢。
In case of failure to unload for a long time due to human factors or irresistible factors, the concrete in the tank shall be checked at any time. Once it is found that the concrete begins to set. Unloading shall be carried out immediately after reporting to the person in charge to prevent the whole tank from being scrapped.
自動攪拌車
二、自動攪拌車隨時需清洗 麻煩但須做
2、 The automatic mixer needs to be cleaned at any time, which is troublesome but must be done
1.運(yùn)營當(dāng)中隨時沖洗
1. Flushing at any time during operation
在每次卸料之后,用攪拌車自己帶水槍對罐口、葉片、進(jìn)料口、罐體以及犄角旮旯進(jìn)行沖洗,防止混凝土凝固之后越積越多,后不好清理。
After each unloading, the tank mouth, blade, feed port, tank body and corners shall be washed with the water gun provided by the mixer truck to prevent the concrete from accumulating after solidification and being difficult to clean.
2.收車之后清洗攪拌車
2. Clean the mixer truck after receiving
每天的運(yùn)送任務(wù)結(jié)束之后,在罐內(nèi)加入1立方米以上的清水,快速的旋轉(zhuǎn)罐體進(jìn)行清洗。有條件的公司,還可以在罐內(nèi)加入石子,效果會更好。
After the daily transportation task is completed, add more than 1 cubic meter of clean water into the tank and quickly rotate the tank for cleaning. Companies with conditions can also add stones into the tank, and the effect will be better.
1.控制氣壓 緊固接頭
1. Control the air pressure and fasten the connector
罐體內(nèi)應(yīng)該打進(jìn)多少的氣壓,這個在出廠的時候已經(jīng)設(shè)定好,不需自己調(diào)節(jié)。如果遇上特殊情況非要調(diào)節(jié),建議壓力控制在3.5Mpa左右,壓力太大容易爆管。另外,新車以及日常使用中,要對管路接口的地方隨時緊固,防止脫落。
How much air pressure should be injected into the tank? This is already set at the time of delivery. It does not need to be adjusted by yourself. If it is necessary to adjust under special circumstances, it is suggested that the pressure should be controlled at about 3.5Mpa. If the pressure is too high, it is easy to burst the pipe. In addition, in the new vehicle and daily use, the pipeline interface shall be fastened at any time to prevent falling off.
2.混凝土攪拌車加水流程
2. Water adding process of concrete mixer
每種混凝土攪拌車加水處的布置都大同小異,一般都是水罐排氣——加滿水——關(guān)閉加水閥;在不用的情況下,好將撥桿的位置放在中間。
The arrangement of the water adding place of each concrete mixer truck is similar. Generally, the water tank is vented - filled with water - the water adding valve is closed; When not in use, put the position of the shift lever in the middle.
3.冬季排盡管內(nèi)余水
3. Drain the residual water in winter
在冬季每天收車之后應(yīng)該排盡水罐內(nèi)和水管中的水,并在水管打入壓縮空氣吹盡各個管路中殘留的水,防止因為結(jié)冰造成管路凍裂。
After the vehicle is collected every day in winter, the water in the water tank and the water pipe shall be drained, and the compressed air shall be injected into the water pipe to blow out the residual water in each pipeline to prevent the pipeline from freezing and cracking due to icing.
攪拌車使用時間越久自身越重的原因就是上述所講解的內(nèi)容了,兩大方面包含幾個小方面的相關(guān)信息希望能夠帶您好的幫助,更多注意就來我們網(wǎng)站http://kitchinit.com咨詢吧。
The longer the mixer truck is used, the heavier it is. The reason is that the content explained above. The two major aspects contain several small aspects of relevant information. I hope you can help me. Please come to our website for more attention http://kitchinit.com Consult.

截屏,微信識別二維碼

RM新时代入口